Advertisement

Ad promo image large
  • Published Date

    March 3, 2026
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

PWC Fayetteville's HOME TOWN UTILITY DON'T DRAIN OUR FUTURE: STOP THE CAPE FEAR RIVER INTERBASIN TRANSFER. Speak up before April 1, 2026 A proposed Interbasin Transfer (IBT) permit would let Fuquay-Varina permanently divert over six million gallons daily to the Neuse Basin impacting over 900,000 residents along the Cape Fear River. Write a letter or send an email by April 1, 2026 to urge the NCDEQ to reject the Fuquay-Varina IBT request. NCDEQ Attn: Maya Holcomb Division of Water Resources 512 N. Salisbury St., Raleigh, NC 27604 or email [email protected] Scan the QR codes to learn more about the impacts the IBT would have on community water if approved. PWC Fayetteville's HOME TOWN UTILITY DON'T DRAIN OUR FUTURE : STOP THE CAPE FEAR RIVER INTERBASIN TRANSFER . Speak up before April 1 , 2026 A proposed Interbasin Transfer ( IBT ) permit would let Fuquay - Varina permanently divert over six million gallons daily to the Neuse Basin impacting over 900,000 residents along the Cape Fear River . Write a letter or send an email by April 1 , 2026 to urge the NCDEQ to reject the Fuquay - Varina IBT request . NCDEQ Attn : Maya Holcomb Division of Water Resources 512 N. Salisbury St. , Raleigh , NC 27604 or email [email protected] Scan the QR codes to learn more about the impacts the IBT would have on community water if approved .